top of page
Resin floors for sports facilities

Resin flooring for sports facilities and gyms

In sports facilities and gyms, the floor is subjected to continuous stress. Daily training, competitions, and matches, along with the passage of athletes, staff, and the public, combined with humidity, sweat, and frequent cleaning, make it necessary to have a floor that can ensure safety in movement, resistance to wear, and ease of maintenance over time. RPM Italia creates resin flooring for indoor and outdoor sports facilities and gyms designed based on the actual usage needs of the spaces. Each intervention is studied according to the activities performed, the frequency of use, and maintenance requirements, to achieve high-performance, stable, and reliable surfaces capable of supporting sports activities without creating operational issues.

The needs of sports facilities and the solutions of RPM Italy

Analyzing the critical issues and usage conditions of gyms and sports facilities, RPM Italy transforms every functional need into resin flooring that supports sports activities and simplifies the management of environments.

Custom flooring for the various areas of sports facilities

Usage methods, access frequency, and user types are key elements in the design of a resin floor for sports facilities. RPM Italia designs and installs resin systems for indoor and outdoor structures, adapting them to the specific functions of the different areas. By adopting targeted thicknesses, finishes, and color solutions, the flooring becomes a tool for the technical organization of spaces, capable of supporting different functions and improving the overall management of the sports facility.

Request a consultation for your gym or indoor or outdoor sports facility.

RPM Italy creates resin flooring for indoor and outdoor sports facilities, gyms, fields, locker rooms, and service areas, designed to ensure washability, resistance, and durability over time. Contact us to receive personalized technical advice or to schedule a dedicated site visit.

Privacy

Dichiaro di avere compiuto sedici anni, e se minore di sedici, di essere stato autorizzato dal titolare della responsabilità genitoriale, pertanto acconsento al trattamento dei miei dati personali così come indicato nella Privacy Policy.

Communications

I consent to the processing of my personal data. For the sending of the newsletter, communications via phone (sms, WhatsApp, voice call)

The most commonly used products for the flooring of sports facilities.

Based on the required performance and the level of use of the spaces, RPM Italia selects specific resin systems for gyms and indoor and outdoor sports facilities. Low or high thickness solutions, materials, and finishes are designed considering usage frequency, environmental conditions, and cleaning needs, to ensure technically adequate and durable surfaces.

Design and installation of resin flooring for sports facilities

The creation of a resin floor for sports facilities requires targeted technical design, capable of correctly assessing the use of spaces and the overall organization of the structure. RPM Italia plans each intervention to achieve a functional, durable surface that meets the specific needs of the facility.

Preliminary analysis of the environment

Every project starts with a technical inspection during which the existing support, environmental conditions, and the usage methods of the floor are analyzed to identify the most suitable resin system and to prevent future issues.

1)

Architect hold plans_edited.jpg

Preparation of the substrate

Targeted mechanical processing, such as sanding, grinding, and shot blasting, is carried out to prepare the concrete substrate, or other types, essential to ensure the adhesion of the resin cycle and the durability of the flooring.

2)

Riparazione.png

Execution of complementary works

Before or during the installation of the resin floor, complementary works are carried out, namely drainage supports, perimeter edges, and skirting boards. These elements help complete the environment and facilitate cleaning and sanitization.

3)

Application of the resin cycle

Based on the required performance, the installation of the resin floor is carried out following specific cycles. We calibrate thicknesses, finishes, and slip resistance to achieve a continuous, safe, and durable surface.

4)

IMG_8126_edited.jpg

Final inspection and commissioning

Once the hardening cycle is complete, and thus the catalysis of the product, the surface is ready to be used. At the end of the application, the floor is checked in every detail to ensure safety, continuity, and compliance with the project.

5)

6%20finitura_edited_edited.jpg

Certifications and technical documentation

6)

At the end of the work, RPM Italia provides the client with the technical documentation related to the applied system, including the certifications required for each sector, to support the needs for monitoring and managing the flooring over time.

Supporto assistenza31531.jpg
bottom of page